Browse by Category
- Additions and Remodels
- Architects
- Asbestos
- Basement Waterproofing
- Bathroom Remodeling
- Cabinets
- Carpentry
- Carpet
- Carpet Cleaning
- Chimney Sweeping
- Cleaning
- Concrete
- Cooling
- Countertops
- Custom Homes
- Decks and Porches
- Decorators and Designers
- Demolition
- Doors
- Drywall
- Dumpster Rental
- Electrical
- Engineers
- Fences
- Flooring
- Foundations
- Garage Doors
- Gutters
- Handyman
- Heating
- Home Appraisals
- Home Inspections
- Home Security
- HVAC
- Insulation
- Junk Removal
- Kitchen Remodeling
- Landscaping
- Locksmiths
- Masonry
- Mold
- Painting
- Pest Control
- Plumbing
- Portable Toilets
- Pressure Cleaning
- Rental Services
- Roofing
- Siding
- Small Projects and Repairs
- Solar Energy
- Sunrooms
- Swimming Pools
- Tile Work
- Toxic Materials
- Tree Service
- Walls
- Water Damage Restoration
- Window Cleaning
- Windows
Let us find decks and porch professionals for you
1
2
3
To Install Synthetic Decking in Summit - How Much?
The standard pricing for synthetic decking installation in Summit Mississippi is $1,958.48. Standard costs for synthetic decking installation in Summit are between $1,823.94 and $2,093.02.Cost of components that may be required for synthetic decking installation in Summit which would entail: sealants, corrosion resistant fasteners, flashing and exterior grade caulking and weather stripping - between $66.08 and $71.56.Read more about Summit Mississippi decks and porches costs.This Summit Decks and Porch quote includes:
- Time unit expenses, job assembly and acquisition duration which are customarily relevant to synthetic decking installation undertakings.
- Expenses linked to work place prep for the synthetic decking installation in Summit undertaking, that includes 10" miter saw, 3 1/4" electric planer, pneumatic finish nailer, electric jigsaw and 3" belt sandersealants, corrosion resistant fasteners, flashing and exterior grade caulking and weather stripping.
The Summit Decks and Porch estimate cannot include:
- It does not encompass permitstest fees which the Summit team of producing requires.
- Mississippi and Summit profit levy on supplies.